Set contains
CLACK CE 1″ control valve 1
Pressurecontainer 12×52, 2,5″ 2
Brine tank 3
1 CLACK CE 1″ valve assembly (V1CIDM):
- CE 1″ control valve
- Upper distributor, 11 segments
- Connection kit 1”
- Power source
- Injector, DLFC – for cation exchange resins
- Funnel
- Instructions for using the valve
2 Pressure reservoir assembly
- Pressure container 12×52, 2,5″
- Stand
- Lower distributor
3 Brine tank
- Brine tank 15x17x36, 125 L
- Brine well assembly (brine valve, overflow kit)
CLACK CE CONTROL VALVE MAIN FEATURES
- Regenerationcontrol based on water content: delayed regeneration, direct regeneration, both
- The ability to change the cycle and duration of regeneration steps
- Multilingual menu: Menu language: English, German, French, Ukrainian
- Different setting modes are available:
– Double or duplex configurations
– Up to 6 systems per system controller
– 2 external devices can be connected at the same time
SPECIFICATIONS
– During filtration – 6,12m3/h
– Washing time – 6.12m3/h
- Inlet and outlet – G 1″
- Sewer connection – G 1″
- Connection for brine line – G 3/8″
- Working pressure – 2-6 bar
- Operating temperature +4…+30 oC
- Electrical requirements – 230 V, 50 Hz
- Electricity – 30 W
- Pressure tank volume – 88 L
- Brine tank capacity -125 L
- Rounded side volume – 5 L
- System weight (without resin) – 20 kg
* For Clack WS1 CE control valves only, including meter, bypass and 1″ fittings kit
RESIN CONTENT
- PC002 Cation exchange resin – 62 L
ANNEXES**
- V3006 WS1 Bypass node
- V3009 WS1 Auxiliary microswitch assembly
- V3070FM Bypass isolation valve during regeneration (without bypass valve) for 1″ and 1,25″ systems
- V3069MM-01 Water 1″ and 1,25″ motorised variable valve
- V3191-01 WS1 Vertical Bypass Adapter Assembly
** Not included in the main set. Can be fitted as an option.
DOWNLOAD